WE 100         
WE 100, pulling the coke train, bound for Cleveland, makes the first curve of the S-bend through the Lorain Co. Fairgrounds. This is the connection between the W&LE line, and the CSX ex-Big Four track. Once on the CSX line the train will become Z708. It will then move to the interlocking in Berea, where it will take NS's tracks on into Cleveland. Tomorrow, the process will be repeated in reverse order as the train makes its way back home light.
Date: 8/15/2006 Location: Wellington, OH Views: 589 Collection Of:   TOM HABAK
Locomotives: WE 100(GP35)    Author:  TOM HABAK
WE 100
Picture Categories: This picture is part of album:  Wellington, Ohio 2006
Share
User Comments
Name Type Comments Date
Ron Moraca General Tom, are those coke cars that hot that they need two gons as a double buffer? They must be sizzling when they're mu'd! 10/24/2007 5:28:24 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=470547