After the load is shifter by a few inches by hydraulic lifts because of clearance issues under the bridge, the load passes slowly under the bridge so it can be shifted back again to its "original" position. 0958 hours. |
Date:
7/22/2012 |
Location:
Skillman, NJ |
Views:
925 |
Collection Of:
Kim Piersol |
Locomotives: Rolling Stock: |
Author: Kim Piersol
|
|
Picture Categories: |
This picture is part of album: Air Products 100th Heat Exchanger Move |