FEC 202 slowly rolls north with ECH Dave Shelly at the throttle. This train came to a complete stop because the draw bridge was being repaired at the time. Ten minutes later the workers cleared the tracks so that the train can pass through. |
Date:
5/28/2011 |
Location:
Stuart, FL |
Views:
215 |
Collection Of:
Jacob Francois |
Locomotives: |
Author: Jacob Francois
|
|
Picture Categories: Action |
This picture is part of album: FEC motive power through the years |