After 19G cleared CP-Easton, 24Z was given the signal to head east. By the time it passed the Phillipsburg Railroad Historians Site the train was making track speed. And the EMD was making most of the noise! |
Date:
11/2/2005 |
Location:
Phillipsburg, NJ |
Views:
903 |
Collection Of:
John C Durant |
Locomotives: |
Author: John C Durant
|
|
Picture Categories: |
This picture is part of album: NS Lehigh Line |