Excavator with his wrecking ball begins to dismantle a segment of the 1995 platform portion
New platform was constructed directly behind the station during the summer of 1995 when the tracks through the Park Avenue tunnel 500 ft to our left were lowered to accommodate double stacks.
Date:
8/6/2009
Location:
Lynchburg, VA
Views:
199
Collection Of:
G. R. Harper
Author:
G. R. Harper
Picture Categories:
This picture is part of album:
Lynchburg makes ready for the Lynchburg-to-Boston, NEC Regional service.
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1701511