SEAL-8 starts down the controlled siding from CP-SK, having just left Selkirk Yard         
Date: 3/18/1997 Location: Ravena, NY   Map Show Ravena on a rail map Views: 85 Collection Of:   Ralph Bonanno
Author:  Ralph Bonanno
SEAL-8 starts down the controlled siding from CP-SK, having just left Selkirk Yard
Picture Categories: This picture is part of album:  Conrail Power in the 1990s
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1090868