By: | Paul S. Highland |
Dates: | 1/1/2001 - 12/31/2021 |
Album Info: | The Lompoc Industrial Lead begins at the UP main line at Surf CA, and runs east about 10.1 miles to Lompoc. From there, the White Hills Industrial Lead runs south about 3.5 miles to the Celite quarry. |